1. Subsurface part:

    1. Estimates of the hydrocarbon resources and substantiation of the recovery coefficients for hydrocarbons;
    2. Designs of the producing test;
    3. Field-development program;
    4. Process chart for development;
    5. Designing of the hydrocarbon fields development;
    6. Specified projects for development (supplementary development);
    7. Technical and economic assessment for development of the hydrocarbon fields;
    8. Hydrocarbon fields development analysis;
    9. Follow-on the implementation of the design projects.
  1. Surface part:

    1. Development of the projects for construction of an oil field facility;
    2. The optimization of the oil-and-gas gathering system taking into account operating regimes of producing wells;
    3. Facility for preliminary water discharge and water treatment using decentralized pumps;
    4. Separators and setups for preliminary gas vent;
    5. Group units for operational measurements of the well productivity;
    6. Designing of the well clusters with noncompressor gaslift technology;
    7. Designing of the centralized compressor gaslift technology;
    8. Designing of the compressor gaslift technology for well clusters;
    9. Optimization of gas dewatering equipment;
    10. Booster modular-pumping-stations.



Copyright © 2002-2003 GASLIFT